继在国际上屡获殊荣的Leonardo Glass Cube之后,3deluxe再次以雄心勃勃的设计和富有表现力的形式语言完成了一个企业建筑作品。客户是Kaffee Partner,一家德国领先的商用咖啡冲泡机供应商。2012年2月,经过短短16个月的施工,在奥斯纳布吕克市28,600平方米的土地上,一座100米长、建筑面积9,800平方米的建筑群竣工。这个极具成本效益的设计将雕塑建筑的美感与商业建筑的高效功能结合起来。行政管理区的概念旨在将物流大厅和车间和谐地整合到三个建筑中,该建筑群此前已由奥斯纳布吕克的工程协会 igk Krabbe GmbH & Co. KG的规划。单独制作的元素悬挂在立面前,是项目的主要特点,它们的流动形式表达了活力、轻盈和创新的力量,这正是Kaffee Partner的企业价值。新总部的建筑和室内设计的色彩概念将白色作为主色调,与来自咖啡世界的近乎自然的色调相结合,这里也有助于营造公司的整体形象。
Following the international award-winning Leonardo Glass Cube 3deluxe have once again completed a piece of corporate architecture with an ambitious design and expressive formal language. The client was Kaffee Partner, a leading supplier of commercially used coffee brewing machines in Germany. In February 2012, following a construction period of just 16 months, a 100-metre tripartite building complex with 9,800 sq.m. of floor space was completed on an area of 28,600 sq.m. in Osnabrück. The extremely cost-effective design unites the aesthetic impact of a sculptural architectural object with the efficient functionality of commercial buildings. The concept for the administration tract aimed to harmoniously integrate the logistics hall and workshop in the building complex, which has previously been planned by the Osnabrück-based engineering association igk Krabbe GmbH & Co. KG. Individually produced elements hanging in front of the façade proved to be the solution; their flowing forms expressing the vitality, lightness, and power of innovation that are Kaffee Partner’s corporate values. The colour concept for the architecture and interior design of the new headquarters combines white as the main colour with near-natural hues from the world of coffee and here too helps create an holistic image of the company.
©3deluxe
©3deluxe
©3deluxe
©3deluxe
©3deluxe
©3deluxe
外立面的弧形丝带由150个独立制作的白色混凝土元素组成,将总部的三个建筑部分融合成一个和谐的整体。它们流畅的轮廓掩盖了混凝土骨架建筑的正交网格,并赋予建筑一种动态的印象。最终,在行政空间的垂直错落的动态构成达到了高潮。天花板的形状各异,每层都是悬臂式的,这个建筑群的角楼非常引人注目。
Curved shaped ribbons on the façade, made of 150 individually fabricated white concrete elements, merge the three building parts of the headquarters to a harmonious ensemble. Their fluid outlines conceal the orthogonal grid of the concrete skeleton construction buildings and lend the architecture an impression of dynamics. It culminates in the animated, vertically staggered composition of the administration wing: With its ceiling slabs, differently shaped and cantilevered on each floor, the corner building of the complex represents a prominent eye-catcher.
©3deluxe
©3deluxe
©3deluxe
©3deluxe
©3deluxe
除了整个大楼的外立面设计以及行政和客户服务部的建筑,3deluxe的设计范围还包括部分室内设计。遵循整体设计方法,顶层的行政套房和半公共空间配备了定制家具和高端配件,延续建筑语言。
Besides the façade design for the entire ensemble and the architecture of the administration and customer service wing, 3deluxe’s scope of planning includes also parts of the interior finish. Following a holistic design approach, the executive suite in the penthouse and the semi-public forum could be equipped with custom-made furniture and high-end fittings that continue the architectural language.
©Emanuel Raab
©Emanuel Raab
©Emanuel Raab
©Emanuel Raab
从整体上看,新的Kaffee Partner公司总部为这家中型公司的约300名员工、客户和奥斯纳布吕克的居民提供了一个友好和现代的工作的世界,在这个世界里,建筑和设计是产品和企业文化中不可缺少的元素,这是真实的生活。
Taken as a whole, the new Kaffee Partner corporate headquarters represent a friendly and contemporary working world for the some 300 employees of the medium-sized company, its clients and the inhabitants of Osnabrück – a world, in which architecture and design are an indispensable element of a product and corporate culture that is authentically lived out.
©3deluxe
©3deluxe
©3deluxe
©3deluxe
©3deluxe
©3deluxe
项目名称:Kaffee Partner headquarters
设计单位:3deluxe
网站:https://www.3deluxe.de/
项目客户:Ost und Koch Immobilien GmbH
项目地点:德国 奥斯纳布吕克
施工周期:2010年11月-2012年2月
完成时间:2012.02.03
项目面积:111,000平方米(一期工程30,000平方米)
照片来源:Emanuel Raab(emanuelraab.de),3deluxe in/exterior
Title of project: Kaffee Partner headquarters
Discipline: Corporate architecture and design
Client: Ost und Koch Immobilien GmbH
Location: Kaffee-Partner-Allee 1, 49090 Osnabrück, Germany
Construction period: November 2010 – February 2012
Completion: 02.03.2012
Plot area: 111,000 m2 (First stage of construction 30,000 m2 )
Expanse: 11,874 m2 (of that 5000 m2 offices, 5000 m2 logistics and workshop)
Photography: Emanuel Raab (emanuelraab.de), 3deluxe in/exterior
|