Zize开发商,布莱顿霍夫市议会和国王教育宣布,Alter & Company是水平公园国家艺术委员会的获奖者。围绕公园和入口的特色榆树提供了阴凉和亲切的斑驳氛围。它们的存在深深地影响了我们的项目的设计。反映入口处悬垂树木的形状的想法是,一个有机的拱门从公园的现有元素中生长出来。
Zize developers, Brighton Hove City Council and Kings Education announced that Alter & Company were the winners of the level park national arts commission. The characteristic elm trees that surround the park and the entrance provide shade and an intimate dappled atmosphere. Their presence deeply informed the design of our proposal, the ‘happenstance archway’. The idea of reflecting the shape of the overhanging trees at the entrance is that of an organic archway growing out from the existing elements of the park.
这是一个可以停顿的地方,你可以从这里观察周围的环境。当你走近看时,金属穿孔组成了历史人物的名字和面孔,这些历史人物对这个楼层和布莱顿都很重要,使两个时间段同时存在:现在和过去。金属上的穿孔让斑驳的光线照射进来,光与影之间难以捉摸的游戏创造了一种诱人的品质,具有强烈的地方感和身份感。
It is a place to pause and from which you can observe your surroundings. As you look closer the metal perforations make up names and faces of historical figures that have importance to the level and Brighton, enabling two time periods to exist simultaneously; the present and past. The perforations in the metal let dappled light in and an elusive play between light and shadows create an alluring quality with a strong sense of place and identity.
▽平面图 Plan
▽轴侧分解 Explode drawing
▽剖面图 Section
Project: The Happenstance Archway
Design firm: Alter & Company
Project location: Brighton , United Kingdom
Project size: 12 m2
Project Budget: £25000
Completion date: 2018
Photo credit: Jim Stephenson
|