BEEAH的新总部由扎哈·哈迪德建筑事务所 (ZHA) 设计,由太阳能电池阵列驱动,并配备了符合 LEED 白金标准的运营技术,旨在实现净零排放,项目将成为该集团的管理和行政中心,并为未来工作场所设立新标杆。
Powered by its solar array and equipped
with next-generation technologies for operations at LEED Platinum standards,
the new headquarters has been designed by Zaha Hadid Architects (ZHA) to
achieve net-zero emissions and will be the group’s management and administrative
centre that sets a new benchmark for future workplaces.
▽视频
BEEAH集团凭借可持续发展和数字化的双支柱战略,在六个关键行业开展了业务,包括废物管理和回收、清洁能源、环境咨询、教育和绿色交通。BEEAH总部是集团的新里程碑,它将在沙迦和全球范围内开拓创新,为集团建立一个运营基地,以多元化的形态进入新的、对未来至关重要的行业。BEEAH 的新总部展示了技术如何扩大可持续影响并最终成为未来智能、可持续城市的蓝图。
With their twin-pillared strategy of
sustainability and digitalisation, BEEAH Group works across six key industries
that include waste management and recycling, clean energy, environmental
consulting, education and green mobility. The headquarters is the latest milestone
for BEEAH Group as it continues to pioneer innovations for Sharjah and across
the globe, establishing a base of operations for the group to diversify into
new, future-critical industries. With their new headquarters, BEEAH
demonstrates how technology can scale sustainable impact and ultimately serve
as a blueprint for tomorrow’s smart, sustainable cities.
为体现这些原则,总部的设计就像是一系列相连的“沙丘”,对场地进行进行定向和塑造,以优化当地的气候条件。建筑嵌入沙迦 Al Sajaa 沙漠的环境中,与周围的景观相呼应,像是被盛行风塑造而成的凹形沙丘和山脊,在沙漠中显得尤为突出。
Embodying these principles, the headquarters’
design responds to its environment as a series of interconnecting ‘dunes’
orientated and shaped to optimize local climatic conditions. Embedded within
its context of Sharjah’s Al Sajaa desert, the design echoes the surrounding
landscape shaped by prevailing winds into concave sand dunes and ridges that
become convex when they intersect.
为确保所有内部空间都有充足的日光和视野,同时减少暴露在烈日下的玻璃数量,建筑的两个主要的“沙丘”容纳了公共和管理部门以及通过中央庭院相互连接的行政区,从而定义出建筑物内的“绿洲”,这也是其自然通风方案中不可或缺的一部分。
Ensuring all internal spaces are provided
with ample daylight and views while limiting the quantity of glazing exposed to
the harsh sun, the headquarters’ two primary ‘dunes’ house the public and
management departments together with the administrative zone that interconnect
via a central courtyard, defining an oasis within the building which is
integral to its natural ventilation strategy.
来访者进入
15 米高的穹顶之下,穹顶不仅增加了自然通风,也使得日光被动地进入建筑物。除了中央庭院和开放式办公室外,总部还设有智能会议室、沉浸式游客中心和礼堂。
Visitors enter beneath the 15-metre high
dome which further enhances natural ventilation and allows passive daylight to
enter the building. In addition to the central courtyard and open-plan office,
the headquarters incorporates smart meeting rooms, an immersive visitors centre
and an auditorium.
9,000 平方米的 BEEAH 总部以可持续性为核心策略,大量使用本地采购材料,并配备了面向未来的技术,以达标 LEED 白金标准的运营模式,实现净零排放和最低能耗。
The 9,000 sq. m BEEAH Headquarters has
sustainability at its core with a high percentage of locally procured materials
and is equipped with future-ready technologies to enable operations at LEED
Platinum standards with net-zero emissions and minimal energy consumption.
▽穹顶与楼梯细节
建筑中的玻璃强化纤维板可减少太阳能增益,楼板和玻璃的冷却系统可调节室内温度,以保持最佳舒适度。场地的水处理系统可过滤废水,从而最大限度地减少水资源消耗,其太阳能农场为特斯拉电池组充电,以满足建筑物每个昼夜的能源需求。
Glass reinforced fibre panels reduce solar
gain while slab and glass cooling regulate interior temperatures for optimum
comfort. On-site water treatment filtrates waste water to minimise consumption
and its solar farm charges Tesla battery packs to meet the building’s energy demand
throughout each day and night.
▽办公空间与会议室
集团的员工体验包括非接触式路径、虚拟礼宾服务、智能会议室和自动化日常任务等配套应用程序。大楼的智能管理系统会根据入住情况和一天中的时间自动调整照明和温度。这些房间还配备了强大的协作工具,可用于远程和混合式办公场景。
The employee experience includes
contactless pathways, a virtual concierge, smart meeting rooms and a companion
app that automates day-to-day tasks. The building’s smart management system
automatically adjusts lighting and temperature depending on occupancy and time
of day. The rooms are also equipped for remote and hybrid work scenarios with
powerful collaboration tools.
扎哈·哈迪德事务所设计的新总部大楼体现了 BEEAH 可持续发展和数字化的双重支柱理念,是 BEEAH 集团的一项重要成就,标志着其从一家在阿联酋沙迦积极解决环境问题的公司成长为一家在关键行业开展业务的国际集团,力求实现可持续的未来。
Manifesting BEEAH’s twin pillars of
sustainability and digitalisation, the new headquarters by ZHA is an important
achievement for BEEAH Group, signalling its growth from a company founded to
proactively tackle environmental issues in Sharjah, UAE, to an international
group with businesses in industries that are critical to realising a
sustainable future.
▽总平面图
BEEAH 集团新总部的设计于2013 年举办竞赛,扎哈·哈迪德团队竞标成功,受 BEEAH 委托设计他们的新总部,建筑将实现净零排放,并与下一代技术相结合,为员工打造便利和协作的新标准办公空间。
Following the 2013 international design
competition, Zaha Hadid and her team at Zaha Hadid Architects were commissioned
by BEEAH to design their new headquarters that would realise net-zero emissions
and be integrated with next generation technologies to achieve a new standard
for employee convenience and collaboration.
▽分层平面图
扎哈·哈迪德事务所与可持续发展工程师和顾问
Atelier Ten 和 Buro
Happold、项目经理
Matthews Southwest、建筑承包商 Al Futtaim Construction 和暖通工程师 Al
Futtaim Engineering 合作交付了 BEEAH 总部。另外,由微软、江森自控和 EVOTEQ(BEEAH Digital 的一家合资企业)提供了智能建筑技术。
ZHA delivered the BEEAH Headquarters in
collaboration with sustainability engineers and consultants Atelier Ten and
Buro Happold, project managers Matthews Southwest, construction contractor Al
Futtaim Construction, and MEP engineers Al Futtaim Engineering. Smart building
technologies by Microsoft, Johnson Controls and EVOTEQ, a BEEAH Digital
venture. Justified.
▽立面图
Architect:
Zaha Hadid Architects (ZHA)
Design:
Zaha Hadid and Patrik Schumacher
Project
Director: Sara Sheikh Akbari
Commercial
Director: Charles Walker
Project
Team: Gerry Cruz (Exterior Package Lead), Drew Merkle (Interior Package Lead),
John Simpson, Matthew Le Grice, Maria Chaparro, Frenji Koshi, Leo Alves, Erwan
Gallou, Vivian Pashiali, Alia Zayani, Alessandra Lazzoni, Zsuzsanna Barát,
Dennis Brezina, Rasha Al-shami, Anna Mieszek, Elena Scripelliti, Eider
Fernandez-Eibar, Marco Pavoni, Ben Kikkawa, Maria Vergopoulou-Efstathiou,
Haohao Chen, Thanh Dao
Phase
1 Project Director: Tariq Khayyat
Phase
1 Project Architect: Kutbuddin Nadiadi
Design
Team: Gerry Cruz, Drew Merkle, Yuxi Fu, Xiaosheng Li, Edward Luckmann, Eleni
Mente, Kwanphil Cho, Mu Ren, Harry Ibbs, Mostafa El Sayed, Suryansh Chandra,
Thomas Jensen, Alexandra Fisher, Spyridon Kaprinis, John Randle, Bechara
Malkoun, Reda Kessanti, Carolina López-Blanco, Takehiko Iseki, Matthew
Johnston, Sabrina Sayed, Zohra Rougab, Carl Khourey, Anas Younes, Lauren
Barclay, Mubarak Al Fahim, Faten El Meri
Competition
Team: Xiaosheng Li, Gerry Cruz, Yuxi Fu, Drew Merkle, Lauren Barclay, Mostafa
El Sayed, Alia Zayani, Mubarak Al Fahim
Consultants:
Structure/Facade/Acoustic/Transport
& Civil: Buro Happold [London]
MEP/
Lighting/Fire Protection & Life Safety: Atelier Ten [London]
Sustainability
(Design Stage): Atelier Ten [London]
Sustainability
(Construction Stage): Buro Happold [Dubai]
Cost:
Gardiner & Theobald [London]
Project
Manager: Matthews Southwest [Dubai]
Landscape:
Francis Landscape [Beirut]
Local
Architect: Bin Dalmouk [Sharjah], DSA Architects International [Dubai]
Main
Contractor: Al Futtaim Construction [Dubai]
|